ZHENGOU GroupZHENG'OU

Aplikasi

Kimia & industri berat

Serangan asam, basa, dan pelarut digabung kejok termal. Vinil ester dan poliuretan di tempat epoksi biasa akan melepuh.

Apa yang harus ditahan lantai ini

Pahami pola kerusakannya sebelum memilih sistem.

  1. 01

    Acids, alkalis and solvents attack the floor daily — standard epoxy dissolves here.

  2. 02

    Thermal shock from hot processes and cold washdown works coatings loose from the slab.

  3. 03

    Spillage must not reach the concrete — or the ground beneath it.

  4. 04

    Mechanical damage — impacts, pallet edges, trolleys — opens paths for chemicals to attack.

Kimia & industri berat

Sistem pelapis yang direkomendasikan

Dipilih berdasarkan beban kerja — tidak ada sistem universal, hanya yang paling cocok.

02

Transparent vinyl ester topcoat

Susunan lapisan
Existing anti-corrosion build, lightly abraded → transparent vinyl ester topcoat

Renews the chemical barrier of a sound system without stripping it — and keeps the substrate visible for inspection.

Urutan aplikasi standar

Lantai yang sama dengan material yang sama dapat bertahan bertahun-tahun lebih lama jika pekerjaan dilakukan dengan cermat. Enam langkah di bawah ini adalah urutan standar kami untuk lantai epoksi: apa yang dilakukan setiap langkah, menurut standar apa, dan apa yang kami periksa saat serah terima. Untuk workshop Anda, kami menyesuaikan jumlah lapisan dan ketebalan dengan beban, bahan kimia, dan jadwal penghentian yang sebenarnya.

  1. 01

    Substrate preparation

    Grinding, repair and drying; the slab must be sound before any corrosion barrier goes on. Defects such as cracks and voids are located and marked one by one, and repaired before any corrosion work starts.

  2. 02

    Vinyl ester primer

    Primer bonds the system to the slab and is the first chemical barrier. Penetration is confirmed zone by zone; under-fed areas get an extra coat.

  3. 03

    Fiberglass lamination

    Fiberglass mat is wetted out layer by layer in vinyl ester — the reinforcement that bridges cracks. Mat overlaps are staggered as the system requires, with air worked out layer by layer.

  4. 04

    Mortar coat

    Vinyl ester mortar builds thickness and levels the reinforced surface. The mortar doubles as the second barrier; corners and pipe penetrations are thickened with a coved transition.

  5. 05

    Topcoat

    Vinyl ester topcoat seals the system into one continuous chemical barrier. After the topcoat, appearance and build are re-checked against the design before handover.

Foto lokasi

Lantai jadi yang difoto di lokasi — klik untuk memperbesar dan memeriksa detailnya.

Fiberglass build-up

Multi-layer fiberglass lamination mid-installation.

Topcoat application

Vinyl ester topcoat applied over large areas — the final chemical barrier taking shape.

Completed resin surface

The continuous resin surface before final inspection.

Proyek representatif

Pilihan proyek yang dikerjakan oleh grup.

  • Jiaxing Geno Electric anti-corrosion project

    Anti-corrosion coating for cable junction boxes and cable trays. Electrical equipment lives in damp, corrosive environments; vinyl-ester systems are applied layer by layer to steel components and junction boxes to lengthen maintenance intervals.

  • Kaide New Energy industrial base (Guangzhou)

    Abrasion-resistant flooring and anti-corrosion works, Lot 1. With a short build programme and overlapping trades at the new-energy base, works were organised as a flowing sequence so flooring and anti-corrosion were handed over together.

  • Wanhua Chemical

    A group framework cooperation newly awarded in 2025. Chemical plants concentrate flooring and anti-corrosion needs in workshops, tank farms and pipe racks; we recommend vinyl-ester or polyurethane systems zone by zone according to the chemicals present.

  • Shougang Group heavy-industrial sites

    Steel and heavy-industry buildings combine abrasion, heat and chemical exposure under one roof. We supply flooring materials to Shougang Group sites, selecting systems zone by zone according to the medium and load each area actually sees.

  • Minth Automotive Europe plant, Serbia

    A 2020 overseas supply project: we exported a complete vinyl ester package — resin, surface coating, fiberglass mats and cloth, corundum sand and application tools — from Shanghai to the buyer's plant in Loznica, Serbia. The floor was built as a fiberglass-reinforced vinyl ester system ("five cloth, seven coat") covering roughly 100,000 m².

Pertanyaan umum

Yang paling sering ditanyakan pembeli saat menentukan pelapis lantai.

Which chemicals can the system withstand?

The vinyl ester range is tested against acids, alkalis and solvents at defined concentrations — the results are published per product on the site. Send us your chemical list and we confirm the fit.

Selengkapnya
Why lay fiberglass cloth?

Concrete moves and cracks; the fiberglass lamination carries those movements and keeps the chemical barrier continuous above them.

Selengkapnya
Our plant has both acid and alkali zones — one system?

In many cases yes; where duty differs sharply, we vary the topcoat between zones while keeping one overall programme.

Selengkapnya
Can you renovate a failed anti-corrosion floor?

Yes — the assessment decides whether the sound layers stay and only the top is rebuilt, or the system is redone from the slab. Both keep the plant running zone by zone.

Selengkapnya

Ceritakan tentang lantai Anda

Kirimkan substrat, luas area, dan apa yang harus ditahan lantai tersebut. Anda akan menerima sistem yang direkomendasikan, gambar susunan lapisan, dan penawaran — biasanya dalam satu hari kerja.

Minta penawaran