ZHENGOU GroupZHENG'OU

Aplikasi

Logistik & rantai dingin

Beban rak tinggi dan siklus bekas-cair berulang. Detail sambungan sama pentingnya dengan lapisan itu sendiri.

Apa yang harus ditahan lantai ini

Pahami pola kerusakannya sebelum memilih sistem.

  1. 01

    Racking leg loads concentrate in tiny footprints; the surface has to take them without dusting or cracking.

  2. 02

    Freeze-thaw cycles in cold-chain zones destroy coatings that were never chosen for low temperature.

  3. 03

    Expansion joints take the movement — if they fail, everything above them fails too.

  4. 04

    A warehouse cannot stop moving for a floor renovation.

Logistik & rantai dingin

Sistem pelapis yang direkomendasikan

Dipilih berdasarkan beban kerja — tidak ada sistem universal, hanya yang paling cocok.

01

Sealed & densified concrete floor

Susunan lapisan
Grinding → densifier penetration → progressive polishing to the desired finish

No coating to peel: the hardener reacts inside the slab, so heavy racking, dusting and freeze-thaw are handled at the material level. The workhorse for large warehouses.

Produk dalam sistem ini

Urutan aplikasi standar

Lantai yang sama dengan material yang sama dapat bertahan bertahun-tahun lebih lama jika pekerjaan dilakukan dengan cermat. Enam langkah di bawah ini adalah urutan standar kami untuk lantai epoksi: apa yang dilakukan setiap langkah, menurut standar apa, dan apa yang kami periksa saat serah terima. Untuk workshop Anda, kami menyesuaikan jumlah lapisan dan ketebalan dengan beban, bahan kimia, dan jadwal penghentian yang sebenarnya.

  1. 01

    Assessment

    Slab condition, loads and temperature zones mapped before any recommendation. The survey covers racking leg pressures, forklift routes and cold-zone extents, and ends in a zoned plan drawing.

  2. 02

    Densifier route

    Grind open the surface, let the densifier react inside, then polish progressively. The slab is kept wet while the densifier reacts, then polished step by step to the target gloss.

  3. 03

    Coating route

    Primer, self-levelling and topcoat applied zone by zone while racking stays loaded. Aisles are closed in rotation, cleaned the same night and handed back next day, so the warehouse never stops.

  4. 04

    Joint detailing

    Movement joints repaired, filled or re-sealed so racking loads and traffic do not chew the edges. After repair, edges are protected along the traffic direction to extend joint life.

Foto lokasi

Lantai jadi yang difoto di lokasi — klik untuk memperbesar dan memeriksa detailnya.

Densified warehouse floor

Polished concrete holding up under racking and traffic without any coating to maintain.

Dock & picking lines

Coated, marked and washed — the working heart of the warehouse.

Cold-chain interface

Polyurethane finish at the temperature transition, selected for freeze-thaw duty.

Proyek representatif

Pilihan proyek yang dikerjakan oleh grup.

  • AGV-driven logistics floors, Zoomlion Yuanjiang

    100,000 m²

    At the Yuanjiang mixer-truck plant, AGVs handle material flow across 100,000 m². Because AGVs steer by floor flatness and guide lines, flatness was controlled as a specification of its own and the surface was line-marked to the logistics layout.

  • Heavy-duty logistics lanes, Zoomlion Changde

    200,000 m²

    In the 200,000 m² Changde construction-machinery plant, the busiest logistics lanes carry the heaviest loads. Those lanes were built with thickened screeds so the aisle floor does not rut or deform under repeated forklift traffic.

Pertanyaan umum

Yang paling sering ditanyakan pembeli saat menentukan pelapis lantai.

Coating or densifier for our warehouse?

Dry, unheated, big-footprint storage usually wins with densifier. If you need marking, washing or bright finish, coat those zones and densify the rest.

Selengkapnya
Will it survive the cold store?

Only if the system was selected for low temperature. Polyurethane systems and densified concrete tolerate freeze-thaw; standard epoxy does not belong there.

Selengkapnya
Can we renovate without emptying the racking?

Yes — work is zoned along the aisles, so only the aisle being worked is closed; racking stays loaded and picking continues elsewhere.

Selengkapnya
The joints keep breaking — can you fix that?

Joint detailing is part of the programme: repair, semi-rigid fill and edge protection so traffic stops chewing the arrises.

Selengkapnya

Ceritakan tentang lantai Anda

Kirimkan substrat, luas area, dan apa yang harus ditahan lantai tersebut. Anda akan menerima sistem yang direkomendasikan, gambar susunan lapisan, dan penawaran — biasanya dalam satu hari kerja.

Minta penawaran